May 8th, 2018
The instrument has been successfully installed onto the satellite platform. In the picture, the satellite is in vertical position for alignment of the instrument: the telescope (bottom part) is being aligned to the baffle (top part with copper colour door). The alignment has been completed within the required accuracy. image courtesy of EADS CASA Espacio, Madrid.